Site Material Data
Description
A material at a specific site, with its site-level planning parameters such as safety stock, lot sizes, and lead times.
Expected Attributes
| Attribute | Expected value(s) | Required | Multiple |
|---|---|---|---|
| Rounding Valuev1 | No | No | |
| Procurement Typev1 | No | No | |
| Planned Delivery Timev1 | No | No | |
| Reorder Pointv1 | No | No | |
| Statusv1 | No | No | |
| Safety Stockv1 | No | No | |
| Maximum Lot Sizev1 | No | No | |
| MRP Controllerv1 | No | No | |
| Planning Methodv1 | No | No | |
| Minimum Lot Sizev1 | No | No | |
| Lot Size Procedurev1 | No | No | |
| MRP Typev1 | No | No | |
| In-House Production Timev1 | No | No | |
| Goods Receipt Processing Timev1 | No | No | |
| Fixed Lot Sizev1 | No | No | |
| Has Materialv1 | No | No | |
| Located Atv1 | No | No |